What to Include in a Stove Installation Handover Pack (And Why It Stops Comebacks)

Most installers hand over a HETAS certificate and a warranty card, then wonder why the customer calls six months later with a problem that was never documented. A proper handover pack changes that.

What to Include in a Stove Installation Handover Pack (And Why It Stops Comebacks)

You finish the install. The stove is running clean, the flue test passes, the HETAS certificate is applied for. You hand the customer a warranty card for the liner, maybe a photocopy of the commissioning sheet, and you head to the next job.

Three months later the phone rings. The glass has gone black. There's a smell when the door opens. The customer is annoyed, and you're driving back to a job you thought was done — because nobody wrote down what the customer was actually told at handover.

A handover pack isn't extra paperwork. It's the thing that stops that call from happening, or makes it a five-minute conversation instead of a half-day site visit.

Why Most Handover Packs Fall Short

Most installers don't skip the handover because they don't care. They skip it because the job overran, the customer wanted to light the stove immediately, and the paperwork was in the van. By the time you remember, the moment has passed.

The typical "handover" in this trade is:

  • HETAS certificate (when it arrives)

  • Flue liner warranty card

  • A verbal "burn it hot for the first few weeks"

  • Maybe a CO alarm test

That's not a handover pack. That's a pile of documents the customer will lose before the first sweep.

What a Proper Handover Pack Actually Contains

Think of it as the single reference the customer keeps, and the single reference you can point to when something comes up later. Every pack should have:

1. The installation record

One page that captures the job basics:

  • Customer name and property address

  • Install date

  • Appliance make, model, and serial number

  • Flue system type, diameter, and liner serial/batch number

  • HETAS reference number (or building control application number)

  • Installer name and HETAS registration number

  • Your business details and insurance information

This is the page a surveyor or buyer's solicitor will ask for when the property sells. If it's not in the pack, the customer calls you.

2. Commissioning and test results

Don't just tick boxes. Record the actual numbers:

  • Flue draught reading (Pa)

  • Smoke test result (pass/fail and duration)

  • Spillage test result

  • CO reading at commissioning (ppm)

  • CO alarm test confirmation

  • Door seal check

  • Air control operation check

A customer who sees "draught: 14 Pa, smoke test: 5 minutes clear" understands this was measured, not guessed.

3. Fuel guidance that's specific to the appliance

"Burn dry wood" is not guidance. The pack should state:

  • The manufacturer's recommended fuel types for this model

  • Maximum log length and diameter

  • Moisture content target (20 percent or less, with a note on how to check)

  • Whether smokeless fuel is approved and which grades

  • A line on the Ready to Burn logo and what it means

If the customer burns wet wood and the glass blacks up, you have a document to refer to. Without it, it's your word against their memory of a conversation in a dusty living room.

4. Operating instructions written for the homeowner

Manufacturer manuals are written for installers. Rewrite the essentials in plain English:

  • How to light the stove from cold (top-down method, air control positions)

  • How to refuel without smoking the room

  • What the air controls actually do (primary, secondary, tertiary if fitted)

  • How to use the airwash to keep the glass clean

  • What "slumbering" means and why the manufacturer advises against it

  • Safe overnight burning procedure if the appliance allows it

Print this on one sheet. Laminate it if you want it to survive the kitchen drawer.

5. Maintenance schedule with dates

HETAS recommends sweeping twice a year for wood, once for smokeless, plus an annual service. Put it in a table:

Task Frequency Next due Who does it Chimney sweep (wood) Every 6 months [date + 6 months] Sweep / installer Chimney sweep (smokeless) Every 12 months [date + 12 months] Sweep / installer Full appliance service Every 12 months [date + 12 months] Installer CO alarm test Monthly Monthly Homeowner Door rope seal check Every 12 months [date + 12 months] Installer

Fill in the first "next due" column before you hand it over. That single action turns a vague recommendation into a booked job.

6. Warranty registrations and claim process

Staple the warranty cards in, but also include a one-page summary:

  • Appliance warranty: manufacturer, length, what's covered, claim contact

  • Flue liner warranty: manufacturer, length, registration deadline, claim contact

  • CO alarm warranty: manufacturer, length, test procedure

  • Workmanship warranty: your terms, duration, what's excluded

Add a line: "If you think something's covered, call us first. We'll check the paperwork and deal with the manufacturer if needed." That positions you as the customer's advocate, not the person they have to argue with.

7. Your contact details and the next touchpoint

Business card is fine, but add:

  • Direct mobile (not just the office line)

  • Email for non-urgent queries

  • The date you'll check in (two weeks post-install is a good default)

  • A line inviting them to send a photo if anything looks wrong

The two-week check-in is where referrals happen. The customer has used the stove, had friends round, and is in the mood to recommend you — if you make it easy.

How to Build the Pack Without Adding Hours

You don't need a desktop publishing suite. A Word template with merge fields, or a PDF you fill in on site, works fine. The key is consistency: every job gets the same sections in the same order.

If you're using a system that tracks job stages, attach the completed pack to the job record at the "Complete" stage. That way it's there when the customer calls in three years, and you're not searching WhatsApp for a photo of the data plate.

The Payoff

A proper handover pack does three things:

  1. Stops comebacks before they start. The customer has the answers in the drawer. The "glass is black" call becomes "I checked the pack, it says burn it hotter, I did and it's fine."

  2. Protects you if a dispute escalates. You can show exactly what was commissioned, what fuel was specified, and what the customer was told.

  3. Creates the next job. The maintenance schedule with filled-in dates is a servicing booking waiting to happen. The two-week check-in is a referral conversation waiting to happen.

Most installers treat the handover as the end of the job. The ones with steady servicing revenue and fewer headaches treat it as the start of the next one.

Next time you're packing the van, leave the handover pack on the kitchen table. It's the five minutes that saves the half day.